The roof is confirmed as a vented attic, unvented conditioned assembly or another approved design
Critical itemVented and unvented strategies should not be mixed casually.
A pre-cover attic ventilation checklist for confirming the approved vented or unvented roof strategy, documenting soffit and other intake openings, installing durable baffles that maintain the designed air path, protecting insulation from wind washing, keeping roof vents, fans and mechanical exhaust distinct, preserving clearances at roof decks and eaves, sealing the ceiling boundary below, coordinating narrow bays and obstructions and photographing each eave before insulation hides the intake and baffle work.
6 items to check
Vented and unvented strategies should not be mixed casually.
A perforated soffit appearance does not prove an open air path.
Loose or crushed baffles can fail after insulation placement.
Insulation should not be displaced or blown into soffits.
Mechanical exhaust should terminate outdoors as designed.
Hidden intake work should be verifiable.
Use before insulation at eaves. Do not add vents indiscriminately to an unvented roof assembly; the approved roof strategy controls. Do not enter unsafe attics or crawlspaces, step between framing, disturb suspect vermiculite or other hazardous materials, cover exposed electrical hazards, block combustion air or vents, seal active moisture, or work near hot flues and recessed fixtures without required clearances and qualified review. Air sealing can change building pressures and combustion behavior.
A pre-insulation air-sealing checklist for defining the pressure boundary, exposing and sealing top plates, plumbing and wiring penetrations, chases, dropped soffits, partition transitions and attic hatches with compatible materials; treating large openings with rigid backing, preserving flue and electrical clearances, coordinating kneewalls and ducts, avoiding moisture trapping, documenting concealed work and verifying completeness before loose fill, batts or spray foam make bypasses difficult to find.
A final attic insulation checklist for confirming the specified material and thermal target, verifying installed quantity and bag or coverage documentation, measuring representative depth without compressing material, checking complete coverage at eaves, corners, platforms, kneewalls and around obstructions, preserving baffles, flue and fixture clearances, inspecting dams and access, identifying voids, wind washing, wet or contaminated material, protecting ducts and controls and documenting labels, photographs, rebates and correction before final payment.
A pre-project checklist for reviewing comfort complaints and energy use, documenting enclosure and HVAC conditions, identifying air leakage and missing or damaged insulation, separating roof or plumbing leaks and indoor humidity from heat-loss symptoms, assessing ventilation and combustion equipment, defining safe diagnostic testing, prioritizing high-value measures, checking utility or tax-program documentation and issuing a room-by-room scope before insulation products or contractor bids are selected.
A pre-entry and prework attic checklist for confirming safe access and walking surfaces, identifying roof leaks and wet or deteriorated sheathing, locating suspect vermiculite or other hazardous material, mapping wiring, junction boxes and recessed lights, checking flues, chimneys and heat-producing equipment, tracing bathroom and kitchen exhaust, documenting existing ventilation and baffles, evaluating storage and pest contamination, protecting occupied areas and approving corrections before insulation is moved or air sealing begins.