Slab cutting, dust, utilities, footing exposure, wall support, and contaminated materials are controlled
Critical itemDemolition should not undermine footings, damage services, spread hazardous dust, or leave unsafe access.
A pre-concrete interior basement perimeter-drain checklist for slab-cut limits, dust and contamination controls, footing and wall condition, trench depth, pipe type and slope, aggregate and filter materials, wall drainage interface, sump basin connection, radon and vapor-control continuity, utilities, structural restrictions, cleanouts, inspection, test records, photographs, and concrete restoration before the drainage work is permanently covered.
6 items to check
Demolition should not undermine footings, damage services, spread hazardous dust, or leave unsafe access.
Collection components should provide a continuous maintainable path to the basin without reverse slope, blockage, crushed pipe, or unapproved connection.
The system should admit water while limiting fine-soil or concrete contamination according to the approved detail.
Drainage work should not create an uncontrolled soil-gas, moisture, pest, thermal, or air-leak pathway.
The collection system should be observable and tested before permanent slab restoration.
The patch should restore the intended slab function without blocking drainage or concealing unresolved work.
Use after an interior drainage channel, pipe, aggregate, sump connection, and wall collection system are installed but before concrete restores the slab. This system manages water reaching the interior perimeter; it should not be described as repairing every exterior, structural, sewer, flood, or groundwater condition. Do not enter unsupported excavations, confined or oxygen-deficient spaces, flooded or sewage-contaminated areas, energized wet areas, visibly unstable structures, or crawlspaces with unknown air, pest, mold, asbestos, or electrical hazards. Do not drill, jack, excavate, open pressurized systems, or alter structural supports without qualified direction.
A pre-backfill existing-home foundation waterproofing checklist for excavation safety, exposed-wall condition, structural cracks and repairs, substrate preparation, selected dampproofing or waterproofing system, seams and penetrations, footing drains, aggregate and filter layers, insulation and protection board, window wells, utilities, discharge, inspection, photographs, wall bracing, and controlled backfill before the work disappears.
A pre-acceptance sump-system checklist for basin size and lid, primary and backup pump compatibility, capacity and head, float movement, check valves, discharge piping, supports, freeze and backflow risk, power and protective devices, battery location and age, alarms, generator or water-powered interfaces, test volumes, failure simulation, maintenance access, owner instructions, and documentation before the basement relies on the system.
A pre-repair foundation crack checklist for documenting location, width and pattern, movement indicators, displacement, water entry, soil and drainage context, wall type, prior repairs, nearby openings and loads, urgent safety triggers, structural or geotechnical referral, monitoring, and evidence before sealant, patching, paint, or finish work hides the condition.
A pre-finishing basement moisture checklist for rain and seasonal history, foundation and slab leakage, condensation, plumbing and HVAC sources, exterior grading and drainage, sump and drain behavior, humidity, material condition, mold or odor concerns, drying verification, radon planning, and release criteria before framing, insulation, drywall, flooring, cabinets, or stored contents hide vulnerable surfaces.