Permits, inspections, selections, and change orders are complete
Critical itemRequired permits and inspections should be closed or at the agreed stage, and the completed work should match approved documents and authorized changes.
A final contractor walkthrough covering permits, waterproofing records, plumbing, electrical, ventilation, tile, fixtures, finishes, cleaning, and closeout documents.
5 items to check
Required permits and inspections should be closed or at the agreed stage, and the completed work should match approved documents and authorized changes.
Shower receptors, walls, niches, curbs, drains, penetrations, and transitions should use a compatible waterproofing system installed and tested as required before cover-up.
Water supplies, shutoffs, valves, fixtures, traps, drains, overflows, and accessible joints should operate as intended and remain watertight.
Receptacles, GFCI protection, luminaires, switches, fans, heaters, and equipment locations should comply with the adopted electrical and mechanical requirements and product listings.
Visible finishes should match the agreed design, remain functional, and be free of unresolved cracks, chips, lippage, poor joints, contamination, damage, or incomplete adjustment.
Use this checklist near substantial completion and before final payment for a bathroom remodel. It is a closeout review, not a substitute for required concealed-work inspections, licensed-trade testing, or manufacturer-specific commissioning.