Hincado e instalación de pilotes
Punto críticoCómo verificar
1. Check driving records — blow counts should match geotechnical requirements
2. Verify pile penetration depth meets minimum design depth
3. Check for refusal or set criteria per the engineer's specifications
4. Verify pile alignment — should be plumb (within 2% of length tolerance)
5. Check for pile damage during driving (crushed tops, splits, doglegs)
6. Verify pile spacing matches foundation plan
7. Check that all piles were driven in correct sequence per plan
Problemas frecuentes
- Insufficient penetration depth (pile does not reach bearing layer)
- Pile damaged during driving (reduced capacity)
- Pile out of alignment (load eccentricity)
- Driving records incomplete or missing
- Wrong pile spacing
- Premature refusal (pile hits obstruction, not bearing layer)