Evaluación de pintura con plomo
Punto críticoCómo verificar
1. Check home age — if built before 1978, assume lead paint until tested
2. Use EPA-approved test kits or hire a certified lead inspector
3. Test all painted surfaces that will be disturbed during renovation
4. Check window sills and frames (highest lead concentration areas)
5. Test exterior paint, especially on trim and siding
6. Verify contractor is EPA RRP (Renovation, Repair, Painting) certified
7. Check for peeling or chipping paint — immediate hazard, especially with children
Problemas frecuentes
- Not testing before renovation in pre-1978 home
- Using uncertified contractor for lead paint disturbance
- Sanding or scraping lead paint without containment (creates toxic dust)
- Children present during lead paint work
- Peeling paint in pre-1978 home ignored
- Improper disposal of lead-contaminated debris