Verificación de estructura
Punto críticoCómo verificar
1. Check wall framing — studs plumb, consistent spacing (16" or 24" OC)
2. Verify blocking is installed for heavy items (TV mounts, grab bars, cabinets, towel bars)
3. Check headers above windows and doors — properly sized for the span
4. Verify fire blocking at top and bottom of balloon-framed walls
5. Check stair framing — solid, no squeaks when walking
6. Verify any steel beams or columns per plans
7. Check for proper nailing patterns at connections
8. Take photos of everything — you won't see it again after drywall
Problemas frecuentes
- No blocking for TV mount (can't hang TV securely later)
- No blocking for bathroom grab bars (can't install without opening wall later)
- Missing fire blocking (fire spread hazard)
- Undersized headers (will sag over time)
- Missing or wrong nailing at connections
- Not documenting with photos (can't troubleshoot issues later)