Cimientos y postes
Punto críticoCómo verificar
1. Verify footings were placed below the local frost line depth (check with local building department)
2. Check that concrete footings are at least 8" in diameter for standard decks
3. Verify posts are pressure-treated lumber rated for ground contact (look for end tags)
4. Check post-to-footing connections — approved metal hardware required (no posts buried in concrete)
5. Verify posts are plumb using a level on two adjacent sides
6. Check post size — minimum 6x6 for freestanding decks, 4x4 may not be permitted in some jurisdictions
7. Inspect for post notching — notches should not exceed 50% of the post dimension
Problemas frecuentes
- Footings above frost line — will heave and shift with freeze-thaw cycles
- Posts set directly in concrete without hardware (traps moisture, causes rot)
- Untreated lumber used for posts (will rot in ground contact)
- Undersized footings for the deck load
- Posts not plumb
- Excessive post notching weakening the post