Preparación de superficie y malla
Punto críticoCómo verificar
1. Verify weather-resistant barrier (WRB/house wrap) is installed behind stucco
2. Check that metal lath or fiberglass mesh is properly installed and overlapped (minimum 1" at edges)
3. Verify lath is attached to studs with proper fasteners (not just stapled to sheathing)
4. Check for weep screeds at the bottom of walls (allows moisture to drain out)
5. Verify control joints are placed at proper intervals (no more than 144 sq ft panels)
6. For EIFS: verify approved substrate and adhesive coverage (minimum 60% adhesive contact)
Problemas frecuentes
- No weather-resistant barrier behind stucco (moisture enters wall cavity)
- Mesh not properly lapped (cracking at joints)
- Missing weep screed at bottom (water trapped in wall)
- No control joints (random cracking)
- EIFS adhesive coverage insufficient (panels can debond)
- Stucco applied directly over wood without proper barrier