Instalación de paneles
Punto críticoCómo verificar
1. Sight along panel edges — should be straight with no waviness (oil-canning)
2. Check panel overlap direction — should be away from prevailing wind
3. Verify screw placement — on ribs/high points for exposed fastener panels, at proper spacing
4. Check that rubber gaskets on screws are not over-compressed or under-tightened
5. Verify panels overhang eave by 1-2" (water drips into gutter)
6. Check end laps — minimum 6" overlap, sealant between
7. Verify ridge cap is properly installed and sealed
Problemas frecuentes
- Oil-canning (waviness in flat areas — cosmetic but common complaint)
- Screws over-driven (compresses gasket, causes leaks)
- Screws under-driven (gasket doesn't seal)
- Wrong overlap direction (wind drives rain under panels)
- Missing sealant at end laps
- Panels not aligned (visible from ground)