Subgrade and vapor barrier
Critical itemSubgrade must be compacted and level. Vapor barrier (minimum 10-mil polyethylene) required under all inhabited slabs. Gravel base recommended.
Checklist for slab-on-grade: subgrade, vapor barrier, reinforcement, thickness, and curing.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Subgrade must be compacted and level. Vapor barrier (minimum 10-mil polyethylene) required under all inhabited slabs. Gravel base recommended.
Minimum 3-1/2" thick for residential slabs per IRC R506.1 (most contractors pour 4" as standard practice). Thicker at edges and under bearing walls. Wire mesh or rebar reinforcement per plans.
Checklist for slab-on-grade: subgrade, vapor barrier, reinforcement, thickness, and curing.
Checklist for inspecting residential foundation quality per IBC Chapter 18 and IRC Chapter 4.
Checklist for inspecting residential wood framing quality per IRC Chapter 6 (Wall Construction) and Chapter 8 (Roof-Ceiling Construction).
Checklist for inspecting residential roofing installation per IRC Chapter 9 and manufacturer specifications.