Pile driving and installation
Critical itemPile driving must achieve required capacity. Driving records must document blow counts, penetration depth, and any interruptions.
Checklist for pile foundation: driving records, alignment, capacity, cutoff level, and pile cap.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Pile driving must achieve required capacity. Driving records must document blow counts, penetration depth, and any interruptions.
Piles must be cut to correct elevation. Pile caps must be properly formed, reinforced, and connected to the pile with adequate embedment.
Checklist for pile foundation: driving records, alignment, capacity, cutoff level, and pile cap.
Checklist for inspecting residential foundation quality per IBC Chapter 18 and IRC Chapter 4.
Checklist for inspecting residential wood framing quality per IRC Chapter 6 (Wall Construction) and Chapter 8 (Roof-Ceiling Construction).
Checklist for inspecting residential roofing installation per IRC Chapter 9 and manufacturer specifications.