Fill material quality
Critical itemFill material must be approved type — no organics, no debris, no expansive clay. Engineered fill typically requires testing and approval.
Checklist for soil compaction: fill material, compaction methods, testing, and moisture content.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Fill material must be approved type — no organics, no debris, no expansive clay. Engineered fill typically requires testing and approval.
Fill must be placed and compacted in lifts (maximum 8" loose). Compaction to 95% Standard Proctor for structural fills. Moisture content must be near optimum.
Checklist for soil compaction: fill material, compaction methods, testing, and moisture content.
Checklist for inspecting deck construction: footings, framing, ledger board, decking, railings, and stairs.
Checklist for fence installation: post depth, spacing, alignment, gate operation, and materials.
Checklist for patio and paver installation: base preparation, edge restraints, paver laying, and joint filling.