Grade slope away from foundation
Critical itemGrade must slope away from the foundation — minimum 6" drop in the first 10 feet. This is the most important drainage requirement for any building.
Checklist for grading and earthwork: slope away from foundation, compaction, drainage, erosion control, and finish grade.
3 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Grade must slope away from the foundation — minimum 6" drop in the first 10 feet. This is the most important drainage requirement for any building.
Fill soil must be properly compacted in lifts. Organic material must not be used as fill. Compaction testing may be required for structural fills.
Stormwater must be directed away from structures. Downspout extensions, swales, and area drains may be needed. No water should drain onto neighbor's property.
Checklist for grading and earthwork: slope away from foundation, compaction, drainage, erosion control, and finish grade.
Checklist for inspecting deck construction: footings, framing, ledger board, decking, railings, and stairs.
Checklist for fence installation: post depth, spacing, alignment, gate operation, and materials.
Checklist for patio and paver installation: base preparation, edge restraints, paver laying, and joint filling.