Insulation board installation
Critical itemInsulation boards must be properly adhered and mechanically fastened. Joints staggered (brick pattern). No gaps between boards.
Checklist for exterior insulation systems: board attachment, mesh embedding, render quality, and detailing.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Insulation boards must be properly adhered and mechanically fastened. Joints staggered (brick pattern). No gaps between boards.
Render must embed reinforcing mesh fully. Surface finish must be uniform. All details (window reveals, drip edges, baseboards) properly executed.
Checklist for exterior insulation systems: board attachment, mesh embedding, render quality, and detailing.
Checklist for inspecting waterproofing and moisture barrier installation per ICC, ASTM, and manufacturer standards.
Checklist for inspecting exterior siding and cladding installation per IBC Chapter 14, IRC R703, and applicable performance standards.
Checklist for inspecting site grading, drainage, and stormwater management per IRC, IBC, and EPA requirements.