The reference and project are authentic and comparable
Critical itemA useful reference should be a real recent customer with a completed project similar enough to test the contractor experience claimed for the proposed work.
A focused reference-call checklist for confirming comparable project experience, scope and budget control, schedule reliability, communication, permits, workmanship, punch-list response, and warranty follow-up.
6 items to check
A useful reference should be a real recent customer with a completed project similar enough to test the contractor experience claimed for the proposed work.
The reference should be able to explain whether the original proposal was complete, how allowances and exclusions worked, what changed, and whether the final price was understandable and documented.
The contractor should manage start dates, work sequencing, crew availability, access, protection, cleanup, and delays in a way consistent with the proposed project.
Required permits, inspections, licensed trades, and subcontractors should be coordinated transparently, with the responsible contracting entity remaining accountable for the agreed work.
The reference should describe observable workmanship, protection of existing property, correction of defects, and how acceptance issues were handled before final payment.
A contractor relationship should be evaluated beyond the final invoice, including documentation, callbacks, warranty response, and whether the customer would hire the same contractor again for the same type of work.
Use this checklist after license and insurance verification but before selecting a contractor. Speak with recent customers whose projects are genuinely comparable in type, size, occupied-home conditions, and completion date. This is not a substitute for official credential and complaint checks.
A pre-hire verification checklist for matching the contractor legal identity, license status and classification, disciplinary record, liability insurance, workers compensation, bond, and expiration dates.
An apples-to-apples bid comparison checklist for scope, quantities, materials, allowances, exclusions, permits, staffing, schedule, payment terms, change-order pricing, warranties, and total project exposure.
A pre-signing contract checklist for legal identity, property, detailed scope, plans and selections, dates, permits, price and payment milestones, change orders, cancellation, dispute terms, warranties, closeout documents, and lien risk.
A before-signing change-order checklist for the reason, exact added and deleted scope, drawings and product changes, alternatives, itemized price and credits, markup, schedule impact, permits, warranties, and authorization.