The approach, doorway and internal circulation work with the intended mobility device and assistance
Critical itemThe bathroom must be reachable and usable as a sequence.
A pre-rough-in bathroom checklist for confirming the intended user and assistance model, a workable route and door, toilet transfer and caregiver space, shower or tub access and seating, lavatory knee or approach space where desired, mirror and storage reach, controls, outlets, lighting and ventilation, grab-bar and seat backing zones, curbless drainage and waterproofing geometry, floor build-up, emergency access and a full-size mock-up before plumbing, framing, wiring or cabinet orders lock in the room.
6 items to check
The bathroom must be reachable and usable as a sequence.
Fixtures and partitions should support the chosen transfer method.
The user should reach controls without entering unsafe water flow.
Cabinet details should not negate the layout.
A curbless layout requires coordinated structural and waterproofing geometry.
Trades should receive one coordinated layout.
Use before trade rough-in. Accessibility dimensions should reflect the applicable project criteria and the person using the bathroom. Do not use a checklist to prescribe medical care, transfer technique or mobility equipment. Do not remove structural framing, build ramps or guards, alter stairs, bathrooms, electrical work or gas systems without required design and permits. ADA Standards do not automatically govern every private single-family home; applicable law, program requirements and the approved project control.
A pre-cover bathroom checklist for locating future and immediate grab bars from the intended user’s transfer and standing pattern, coordinating toilet, shower and tub positions, selecting continuous or targeted structural backing, checking stud and partition capacity, avoiding pipes, wires, valves and waterproofing conflicts, recording finished-surface elevations and bar zones, supporting fold-down seats or rails where planned, restoring fire and acoustic assemblies and saving dimensioned photographs before backer board, drywall, waterproofing or tile hides the backing.
A final-acceptance checklist for an accessible shower or tub covering step or threshold transitions, drainage and containment, slip resistance, seat stability and dimensions, grab-bar anchorage, control and hand-shower reach, temperature limiting and hot-water response, glass or curtain interference, transfer and caregiver space, lighting, ventilation, emergency access, leaks, finish edges, cleaning and maintenance instructions and a safe user trial before final payment and routine bathing.
A pre-design checklist for documenting the actual users, mobility devices, assistance needs, likely future changes and emergency considerations; tracing a continuous route from parking or drop-off through an entrance to essential living spaces; measuring doors, halls, turns, thresholds and floor changes; identifying bathroom, bedroom, kitchen and laundry priorities; separating immediate safety work from major reconstruction; and approving a realistic phased accessibility plan before products or contractors are selected.
A pre-construction checklist for selecting the most reliable step-free entrance, verifying parking or drop-off connection, exterior route width and cross-slope goals, drainage and snow or weather exposure, landing and door maneuvering space, threshold and water-management details, lighting, handrail or guard needs, structural support, utility and property constraints, door operation and security, and an alternate emergency route before excavation, concrete, decking or door replacement fixes the geometry.