Permits and site selection
Critical itemCheck local building codes to determine if a permit is required. Most jurisdictions require a building permit for structures over 120 sq ft, though some set the threshold at 100 or 200 sq ft. Verify property setback requirements (typically 5-10' from property lines and structures). Check HOA covenants for restrictions on size, placement, and appearance. Site the shed on well-drained, level ground away from underground utilities (call 811 before digging).