Water supply rough-in
Critical itemPer RGSPPDADAR, hot and cold water supply lines must be properly sized (typically 3/4" main, 1/2" branch), supported every 6' horizontally and 10' vertically, and use approved materials (copper, PEX, or CPVC). Hot on left, cold on right when facing the fixture. Supply stubs must be at correct heights: toilet 6" above floor, sink 18–24" above floor, shower valve 48" above floor.