Cabinet mounting and alignment
Critical itemCabinets must be level, plumb, and securely fastened to wall studs or masonry. All doors and drawers should operate smoothly.
Checklist for cabinet installation: level, plumb, attachment, door alignment, and hardware.
1 item to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Cabinets must be level, plumb, and securely fastened to wall studs or masonry. All doors and drawers should operate smoothly.
Checklist for cabinet installation: level, plumb, attachment, door alignment, and hardware.
Checklist for inspecting plasterboard (drywall) partition and lining systems in accordance with EN 520, EN 14195, EN 13914-1 and Portuguese RGEU acoustic and fire requirements.
Checklist for inspecting ceramic and stone tiling installations in accordance with EN 14411, EN 12004, EN 13888 and Portuguese RGEU requirements.
Checklist for interior doors: operation, fit, hardware, and finish quality.