Pile driving and installation
Critical itemPile driving must achieve required capacity. Driving records must document blow counts, penetration depth, and any interruptions.
Checklist for pile foundation: driving records, alignment, capacity, cutoff level, and pile cap.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Pile driving must achieve required capacity. Driving records must document blow counts, penetration depth, and any interruptions.
Piles must be cut to correct elevation. Pile caps must be properly formed, reinforced, and connected to the pile with adequate embedment.
Checklist for pile foundation: driving records, alignment, capacity, cutoff level, and pile cap.
Checklists for inspecting reinforced concrete structures in accordance with EN 1992, NTC 2018 Chapter 4, EN 13670 and EN 206.
Checklists for inspecting steel structures in accordance with EN 1993, NTC 2018 Chapter 4.2, EN 1090 and related standards.
Checklists for inspecting masonry structures in accordance with EN 1996, NTC 2018 Chapter 4.5, EN 771 and EN 998-2.