Wall construction quality
Critical itemBasement walls must resist lateral soil pressure. Poured concrete or properly grouted CMU block required. Reinforcement per structural plans.
Checklist for basement wall construction: waterproofing, reinforcement, drainage, and wall type verification.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Basement walls must resist lateral soil pressure. Poured concrete or properly grouted CMU block required. Reinforcement per structural plans.
Exterior of basement walls must be waterproofed before backfill. Foundation drain (perimeter drain) required at footing level.
Checklist for basement wall construction: waterproofing, reinforcement, drainage, and wall type verification.
Checklists for inspecting reinforced concrete structures in accordance with EN 1992, NTC 2018 Chapter 4, EN 13670 and EN 206.
Checklists for inspecting steel structures in accordance with EN 1993, NTC 2018 Chapter 4.2, EN 1090 and related standards.
Checklists for inspecting masonry structures in accordance with EN 1996, NTC 2018 Chapter 4.5, EN 771 and EN 998-2.