Insulation board installation
Critical itemInsulation boards must be properly adhered and mechanically fastened. Joints staggered (brick pattern). No gaps between boards.
Checklist for exterior insulation systems: board attachment, mesh embedding, render quality, and detailing.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Insulation boards must be properly adhered and mechanically fastened. Joints staggered (brick pattern). No gaps between boards.
Render must embed reinforcing mesh fully. Surface finish must be uniform. All details (window reveals, drip edges, baseboards) properly executed.
Checklist for exterior insulation systems: board attachment, mesh embedding, render quality, and detailing.
Checklists for inspecting waterproofing and damp-proofing systems in accordance with EN 13967, EN 13969, EN 14967, UNI 11470, UNI 8178 and NTC 2018.
Checklist for inspecting exterior cladding and facade systems per ETAG 034, EN 13830, and related EN standards for wind loading, fire performance, and weatherproofing.
Checklists for inspecting window and door installations including thermal performance, air and water tightness, glazing and sealing in accordance with EN 14351-1, UNI 11673, D.M. 26/06/2015 and Italian energy regulations.