Pre-demolition survey
Critical itemPer EN 17748 and BS 6187 Clause 5, a comprehensive pre-demolition survey must be carried out before any demolition work begins. The survey must identify the structural form and condition of the building, the presence of hazardous materials, the location of live services (gas, electricity, water, telecommunications), and any constraints from adjacent structures or public areas. A demolition method statement must be prepared based on the survey findings. The survey must be carried out by a competent person with relevant structural engineering knowledge.