Cabinet mounting and alignment
Critical itemCabinets must be level, plumb, and securely fastened to wall studs or masonry. All doors and drawers should operate smoothly.
Checklist for cabinet installation: level, plumb, attachment, door alignment, and hardware.
1 item to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Cabinets must be level, plumb, and securely fastened to wall studs or masonry. All doors and drawers should operate smoothly.
Checklist for cabinet installation: level, plumb, attachment, door alignment, and hardware.
Checklist for inspecting drywall and plasterboard installations in accordance with DTU 25.41 (plasterboard partition and lining works) and NF EN 520 (plasterboard product standard).
Checklist for inspecting ceramic and stone tiling installations in accordance with DTU 52.2 (bonded floor and wall tiling), NF EN 14411 (ceramic tile product standard), and the French Classement UPEC system.
Checklist for inspecting floor covering installations per EN product standards and performance classifications.