Surface preparation and mesh
Critical itemStucco requires proper substrate, weather-resistant barrier, and embedded reinforcing mesh. EIFS requires approved substrate and proper adhesive application.
Checklist for stucco and EIFS installation: substrate, mesh, thickness, cracks, and moisture management.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Stucco requires proper substrate, weather-resistant barrier, and embedded reinforcing mesh. EIFS requires approved substrate and proper adhesive application.
Three-coat stucco: scratch coat, brown coat, finish coat — total minimum 7/8" thickness. Each coat must cure before next application.
Checklist for stucco and EIFS installation: substrate, mesh, thickness, cracks, and moisture management.
Checklist for inspecting waterproofing systems in accordance with DTU 14.1 (below-grade waterproofing), DTU 43.1 (roof waterproofing), and EN 14967 (flexible sheets for waterproofing).
Checklist for inspecting exterior cladding and facade systems per ETAG 034, EN 13830, and related EN standards for wind loading, fire performance, and weatherproofing.
Checklist for inspecting pitched and flat roofing installations in accordance with DTU 40.x series (pitched roof coverings), DTU 43.x series (flat roof waterproofing), and associated French and European standards.