Substrate and weather barrier
Critical itemStone veneer requires weather-resistant barrier, metal lath, and scratch coat. Shelf angle or foundation ledge required for structural support.
Checklist for stone veneer: substrate, mortar, weep holes, flashing, and structural support.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Stone veneer requires weather-resistant barrier, metal lath, and scratch coat. Shelf angle or foundation ledge required for structural support.
Stones must be firmly bonded with consistent mortar joints. Pattern should look natural. No loose or hollow stones.
Checklist for stone veneer: substrate, mortar, weep holes, flashing, and structural support.
Checklist for inspecting waterproofing systems in accordance with DTU 14.1 (below-grade waterproofing), DTU 43.1 (roof waterproofing), and EN 14967 (flexible sheets for waterproofing).
Checklist for inspecting exterior cladding and facade systems per ETAG 034, EN 13830, and related EN standards for wind loading, fire performance, and weatherproofing.
Checklist for inspecting pitched and flat roofing installations in accordance with DTU 40.x series (pitched roof coverings), DTU 43.x series (flat roof waterproofing), and associated French and European standards.