Insulation board installation
Critical itemInsulation boards must be properly adhered and mechanically fastened. Joints staggered (brick pattern). No gaps between boards.
Checklist for exterior insulation systems: board attachment, mesh embedding, render quality, and detailing.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Insulation boards must be properly adhered and mechanically fastened. Joints staggered (brick pattern). No gaps between boards.
Render must embed reinforcing mesh fully. Surface finish must be uniform. All details (window reveals, drip edges, baseboards) properly executed.
Checklist for exterior insulation systems: board attachment, mesh embedding, render quality, and detailing.
Checklist for inspecting waterproofing systems in accordance with DTU 14.1 (below-grade waterproofing), DTU 43.1 (roof waterproofing), and EN 14967 (flexible sheets for waterproofing).
Checklist for inspecting exterior cladding and facade systems per ETAG 034, EN 13830, and related EN standards for wind loading, fire performance, and weatherproofing.
Checklist for inspecting pitched and flat roofing installations in accordance with DTU 40.x series (pitched roof coverings), DTU 43.x series (flat roof waterproofing), and associated French and European standards.