Form alignment and dimensions
Critical itemForms must be set to correct dimensions, alignment, and elevation per plans. Tolerances per ACI 117.
Checklist for formwork: alignment, bracing, dimensions, cleanliness, and release agent.
3 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Forms must be set to correct dimensions, alignment, and elevation per plans. Tolerances per ACI 117.
Forms must be adequately braced to resist concrete pressure during pour. Wall forms need snap ties or through-bolts plus diagonal bracing.
Forms must be clean, tight-fitting, and treated with release agent. No debris in forms before pour.
Checklist for formwork: alignment, bracing, dimensions, cleanliness, and release agent.
Checklist for inspecting reinforced concrete structures per EN 1992 (Eurocode 2) and execution standard EN 13670.
Checklist for inspecting steel structures per EN 1993 (Eurocode 3) and execution standard EN 1090.