Test preparation
Critical itemPer EN 12056 & EN 806, all new or repaired water supply piping must be pressure tested before concealment. All fixture connections must be capped or plugged. System must be filled with water slowly to remove air. Test gauge must be calibrated and accurate. Temperature must be stable during test (thermal expansion affects readings).