Membrane condition
Critical itemFlat roof membrane (TPO, EPDM, PVC, or modified bitumen) must be intact with no punctures, tears, or blisters. Seams must be properly welded or adhered.
Checklist for flat roof: membrane condition, drainage, flashing, penetrations, and ponding.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Flat roof membrane (TPO, EPDM, PVC, or modified bitumen) must be intact with no punctures, tears, or blisters. Seams must be properly welded or adhered.
Flat roofs must drain completely within 48 hours. Ponding water accelerates membrane degradation and adds structural load.
Checklist for flat roof: membrane condition, drainage, flashing, penetrations, and ponding.
Checklist for inspecting waterproofing systems per EN 14967, EN 13707, EN 13969, EN 1928, and EN 13956.
Checklist for inspecting windows and external doors per EN 14351-1 and related performance standards.
Checklist for inspecting exterior cladding and facade systems per ETAG 034, EN 13830, and related EN standards for wind loading, fire performance, and weatherproofing.