Drainage behind wall
Critical itemDrainage is the most critical element of retaining wall design. Water pressure behind the wall (hydrostatic pressure) is the #1 cause of failure.
Checklist for retaining wall: drainage, structural integrity, lean, cracks, and surcharge loading.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Drainage is the most critical element of retaining wall design. Water pressure behind the wall (hydrostatic pressure) is the #1 cause of failure.
Wall must be plumb or leaning slightly into the retained soil. Cracks, bulges, or leaning away from soil indicate potential failure.
Checklist for retaining wall: drainage, structural integrity, lean, cracks, and surcharge loading.
Checklist for inspecting reinforced concrete structures in accordance with EN 1992 (Eurocode 2), execution standard EN 13670, CTE DB SE and EHE-08.
Checklist for inspecting steel structures in accordance with EN 1993 (Eurocode 3), execution standard EN 1090 and CTE DB SE-A.
Checklist for inspecting masonry structures in accordance with EN 1996 (Eurocode 6), execution standard EN 1996-2 and CTE DB SE-F.