Waterproofing and moisture barrier
Critical itemWet areas require tanking (waterproof membrane) system applied to walls and floor. EN 14891 compliant waterproofing required. Minimum 200mm membrane height above splash zones.
Checklist for verifying bathroom renovation quality: waterproofing, plumbing, electrical, tile work, ventilation, and fixtures.
5 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Wet areas require tanking (waterproof membrane) system applied to walls and floor. EN 14891 compliant waterproofing required. Minimum 200mm membrane height above splash zones.
All sanitary ware must be securely fixed, leak-free, with accessible isolation valves. WC must be firmly mounted. Mixer taps should have hot on the left.
Bathroom electrical zones (0-2) dictate what equipment is permitted. RCD protection (30mA) required for all circuits. IP-rated fixtures required in wet zones.
Tiles must be firmly bonded with consistent joint widths. No lippage exceeding 1mm for rectified tiles. Joints must be fully filled. Silicone at movement joints.
Bathroom ventilation required — minimum 15 l/s (54 m³/h) continuous or intermittent extraction. Must exhaust to exterior, not into roof space.
Checklist for verifying bathroom renovation quality: waterproofing, plumbing, electrical, tile work, ventilation, and fixtures.
Checklist for verifying kitchen remodel quality: cabinets, countertops, plumbing, electrical, ventilation, and flooring.
Checklist for basement finishing: moisture control, framing, insulation, electrical, egress windows, and flooring.
Checklist for attic conversion: structural reinforcement, insulation, ventilation, fire safety, stairs, and dormers.