Membrane condition
Critical itemFlat roof membrane (TPO, EPDM, PVC, or modified bitumen) must be intact with no punctures, tears, or blisters. Seams must be properly welded or adhered.
Checklist for flat roof: membrane condition, drainage, flashing, penetrations, and ponding.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Flat roof membrane (TPO, EPDM, PVC, or modified bitumen) must be intact with no punctures, tears, or blisters. Seams must be properly welded or adhered.
Flat roofs must drain completely within 48 hours. Ponding water accelerates membrane degradation and adds structural load.
Checklist for flat roof: membrane condition, drainage, flashing, penetrations, and ponding.
Checklist for inspecting waterproofing and moisture protection systems in accordance with EN 13967, EN 13859, CTE DB-HS1 and related UNE standards.
Checklist for inspecting window and external door installations in accordance with EN 14351-1, EN 12207/12208/12210, CTE DB-HE, CTE DB-HS1, CTE DB-HR, and related UNE standards.
Checklist for inspecting exterior cladding and facade systems per ETAG 034, EN 13830, and related EN standards for wind loading, fire performance, and weatherproofing.