Bolted connections
Critical itemBolted connections must use correct bolt grade, size, and number per plans. Bolts must be properly tightened. Washers required under nuts.
Checklist for structural connections: bolts, welds, hangers, hold-downs, and hardware.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Bolted connections must use correct bolt grade, size, and number per plans. Bolts must be properly tightened. Washers required under nuts.
Simpson Strong-Tie or equivalent metal connectors required at critical connections. Hold-downs resist uplift at shear walls. Hurricane ties at roof-to-wall connections.
Checklist for structural connections: bolts, welds, hangers, hold-downs, and hardware.
Checklist for inspecting reinforced concrete structures in accordance with EN 1992 (Eurocode 2), DIN EN 1992-1-1/NA, execution standard EN 13670 and DIN 1045-3.
Checklist for inspecting steel structures in accordance with EN 1993 (Eurocode 3), DIN EN 1993-1-1/NA and execution standard EN 1090.
Checklist for inspecting masonry structures in accordance with EN 1996 (Eurocode 6), DIN EN 1996-1-1/NA and execution standard EN 1996-2.