Critical itemForms must be set to correct dimensions, alignment, and elevation per plans. Tolerances per ACI 117.
Checklist for formwork: alignment, bracing, dimensions, cleanliness, and release agent.
3 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Forms must be set to correct dimensions, alignment, and elevation per plans. Tolerances per ACI 117.
Forms must be adequately braced to resist concrete pressure during pour. Wall forms need snap ties or through-bolts plus diagonal bracing.
Forms must be clean, tight-fitting, and treated with release agent. No debris in forms before pour.
Checklist for formwork: alignment, bracing, dimensions, cleanliness, and release agent.
Checklist for inspecting reinforced concrete structures in accordance with EN 1992 (Eurocode 2), DIN EN 1992-1-1/NA, execution standard EN 13670 and DIN 1045-3.
Checklist for inspecting steel structures in accordance with EN 1993 (Eurocode 3), DIN EN 1993-1-1/NA and execution standard EN 1090.
Checklist for inspecting masonry structures in accordance with EN 1996 (Eurocode 6), DIN EN 1996-1-1/NA and execution standard EN 1996-2.