Wall construction quality
Critical itemBasement walls must resist lateral soil pressure. Poured concrete or properly grouted CMU block required. Reinforcement per structural plans.
Checklist for basement wall construction: waterproofing, reinforcement, drainage, and wall type verification.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Basement walls must resist lateral soil pressure. Poured concrete or properly grouted CMU block required. Reinforcement per structural plans.
Exterior of basement walls must be waterproofed before backfill. Foundation drain (perimeter drain) required at footing level.
Checklist for basement wall construction: waterproofing, reinforcement, drainage, and wall type verification.
Checklist for inspecting reinforced concrete structures in accordance with EN 1992 (Eurocode 2), DIN EN 1992-1-1/NA, execution standard EN 13670 and DIN 1045-3.
Checklist for inspecting steel structures in accordance with EN 1993 (Eurocode 3), DIN EN 1993-1-1/NA and execution standard EN 1090.
Checklist for inspecting masonry structures in accordance with EN 1996 (Eurocode 6), DIN EN 1996-1-1/NA and execution standard EN 1996-2.