Fixture installation and switches
Critical itemFixtures must be properly mounted to electrical boxes, correct type for location (damp/wet rated where needed), and switched conveniently.
Checklist for lighting: fixture mounting, circuit connections, switch operation, and code compliance.
1 item to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Fixtures must be properly mounted to electrical boxes, correct type for location (damp/wet rated where needed), and switched conveniently.
Checklist for lighting: fixture mounting, circuit connections, switch operation, and code compliance.
Checklist for inspecting plumbing and sanitary installations in accordance with DIN 1988, DIN EN 806, DIN EN 12056 and DIN 1986.
Checklist for inspecting electrical installations in accordance with DIN VDE 0100 series and DIN 18015.
Checklist for inspecting heating, ventilation, and air conditioning systems per EN standards and energy performance requirements.