Cabinet mounting and alignment
Critical itemCabinets must be level, plumb, and securely fastened to wall studs or masonry. All doors and drawers should operate smoothly.
Checklist for cabinet installation: level, plumb, attachment, door alignment, and hardware.
1 item to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Cabinets must be level, plumb, and securely fastened to wall studs or masonry. All doors and drawers should operate smoothly.
Checklist for cabinet installation: level, plumb, attachment, door alignment, and hardware.
Checklist for inspecting drywall and plasterboard construction in accordance with DIN 18181, DIN 18182, EN 520 and DIN 4103-1.
Checklist for inspecting tiling and ceramic coverings in accordance with DIN 18157, DIN 18352, EN 14411 and EN 12004.
Checklist for inspecting painting and coating works in accordance with DIN 18363, EN 13300 and ChemVOCFarbV (German VOC Ordinance).