Substrate and weather barrier
Critical itemStone veneer requires weather-resistant barrier, metal lath, and scratch coat. Shelf angle or foundation ledge required for structural support.
Checklist for stone veneer: substrate, mortar, weep holes, flashing, and structural support.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Stone veneer requires weather-resistant barrier, metal lath, and scratch coat. Shelf angle or foundation ledge required for structural support.
Stones must be firmly bonded with consistent mortar joints. Pattern should look natural. No loose or hollow stones.
Checklist for stone veneer: substrate, mortar, weep holes, flashing, and structural support.
Checklist for inspecting waterproofing and moisture protection systems in accordance with DIN 18533 (below-grade), DIN 18534 (interior wet rooms), DIN 18531 (flat roofs) and EN 14967.
Checklist for inspecting exterior cladding and facade systems per ETAG 034, EN 13830, and related EN standards for wind loading, fire performance, and weatherproofing.
Checklist for inspecting pitched and flat roofing systems per EN product standards, DIN 68800 for timber protection, and Eurocode load requirements as implemented through German national annexes.