Qualité de pose
Point critiqueHardwood must be acclimated before installation. Subfloor must be flat and dry. Expansion gaps required at all walls.
Norme
Hardwood must be acclimated before installation. Subfloor must be flat and dry. Expansion gaps required at all walls.
Comment vérifier
1. Walk the entire floor — check for squeaks, loose boards, or soft spots
2. Check expansion gaps at walls (1/4" to 1/2") — covered by baseboard
3. Check for cupping or crowning of boards (moisture problem)
4. Verify boards are tight with no gaps between them
5. Check flatness — 3/16" tolerance in 10 feet
6. Look for scratches or damage from construction
7. Check transitions to other flooring types — smooth, proper transition strip
8. Verify nail/staple pattern — proper spacing, none visible on surface
Problèmes fréquents
- Cupping boards (moisture from subfloor — was wood acclimated?)
- No expansion gaps (floor buckles as it expands)
- Squeaking (nails not holding, subfloor issues)
- Visible gaps between boards (wood dried after installation)
- Scratches from post-installation construction traffic
- Boards not staggered (end joints should be offset minimum 6")