Bolted connections
Critical itemBolted connections must use correct bolt grade, size, and number per plans. Bolts must be properly tightened. Washers required under nuts.
Checklist for structural connections: bolts, welds, hangers, hold-downs, and hardware.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Bolted connections must use correct bolt grade, size, and number per plans. Bolts must be properly tightened. Washers required under nuts.
Simpson Strong-Tie or equivalent metal connectors required at critical connections. Hold-downs resist uplift at shear walls. Hurricane ties at roof-to-wall connections.
Checklist for structural connections: bolts, welds, hangers, hold-downs, and hardware.
Checklist for inspecting reinforced concrete structures per CSA A23.3 (Design of Concrete Structures) and CSA A23.1/A23.2 (Concrete Materials and Methods of Construction/Test Methods).
Checklist for inspecting structural steel fabrication and erection per CSA S16 (Design of Steel Structures), CSA W59 (Welded Steel Construction), and NBC Part 4 (Structural Design).
Checklist for inspecting structural timber construction per CSA O86 (Engineering Design in Wood), NBC Part 4 (Structural Design), and CSA S406 (Permanent Wood Foundations).