Pile driving and installation
Critical itemPile driving must achieve required capacity. Driving records must document blow counts, penetration depth, and any interruptions.
Checklist for pile foundation: driving records, alignment, capacity, cutoff level, and pile cap.
2 items to check
These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.
If you notice an error, please email [email protected].
For a complete inspection, also consider:
Pile driving must achieve required capacity. Driving records must document blow counts, penetration depth, and any interruptions.
Piles must be cut to correct elevation. Pile caps must be properly formed, reinforced, and connected to the pile with adequate embedment.
Checklist for pile foundation: driving records, alignment, capacity, cutoff level, and pile cap.
Checklist for inspecting reinforced concrete structures per CSA A23.3 (Design of Concrete Structures) and CSA A23.1/A23.2 (Concrete Materials and Methods of Construction/Test Methods).
Checklist for inspecting structural steel fabrication and erection per CSA S16 (Design of Steel Structures), CSA W59 (Welded Steel Construction), and NBC Part 4 (Structural Design).
Checklist for inspecting structural timber construction per CSA O86 (Engineering Design in Wood), NBC Part 4 (Structural Design), and CSA S406 (Permanent Wood Foundations).