Kitchen Remodel Inspection

Checklist for verifying kitchen remodel quality: cabinets, countertops, plumbing, electrical, ventilation, and flooring.

6 items to check

BETA

These checklists are in development and testing. Information is for reference only and does not replace professional consultation. Data may contain inaccuracies. Consult a qualified professional.

If you notice an error, please email [email protected].

Inspection progress0 of 6
0%

Cabinet installation quality

Critical item

Cabinets must be level, plumb, and securely fastened to wall studs or blocking. All doors and drawers should operate smoothly without binding.

Countertop installation

Critical item

Countertops must be level, properly supported, with tight seams and sealed backsplash. Sink cutouts should be properly sealed.

Plumbing connections

Critical item

All supply and drain connections must be leak-free. Shut-off valves must be accessible and functional.

Electrical circuits and outlets

Critical item

Kitchen requires minimum two 20-amp split receptacle circuits for countertop. GFCI protection required within 1.5m of sink.

Ventilation and range hood

Range hoods should exhaust to exterior. Minimum 100 CFM. Ductwork must be smooth metal and properly sealed. Make-up air required for hoods over 400 CFM.

Flooring and transitions

Kitchen flooring must be properly installed on flat subfloor. Transitions should be smooth and trip-free.

Checklist for verifying kitchen remodel quality: cabinets, countertops, plumbing, electrical, ventilation, and flooring.